Tepee Pole Instructions
- 1.0 - PACKAGE APPEARANCE
- 2.0 - PACKAGE CONTENTS
- 3.0 - REQUIREMENTS AND SPECIFICATIONS
- 4.0 - TEPEE HEAD ASSEMBLY
- 5.0 - TEPEE POLE ASSEMBLY
- 6.0 - CABLE ANCHORING
- 7.0 - SYSTEM INSTALLATION
- 8.0 - QUICKSPIN™ SYSTEM OPERATION
- 9.0 - POLE DISASSEMBLY
- 10.0 - DIVIDING THE POLE (optional)
- 11.0 - PRE-USE INSPECTIONS
- 12.0 - MAINTENANCE
- 13.0 - WARNINGS AND PRECAUTIONS
- 14.0 - TROUBLESHOOTING

The THEPOLE TEPEE system allows the upper end of the pole to be secured using steel cables. This solution enables the installation of a stable pole wit a maximum height of 4.50 m, even in environments where ceiling anchoring is not possible.
Installation of the Tepee Pole requires AT LEAST two people.
1.0 PACKAGE APPEARANCE: 5 PACKAGES
4 cardboard tubes containing the three pole sections and the 1 m Tepee bar.
1 box containing the base, assembly tools and instructions.
1 square box 30cm x 25cm x 20cm containing the Grid tip, 4 ratchet tensioning straps, 4 steel anchoring cables, 4 karabiners, 2 shackles and 4 bar fixing screws.

2.0 PACKAGE CONTENTS
N° 2 Upper pole sections: length 150 cm, diameter 45 mm, in the selected coating, with pre-assembled internal joints.
N° 1 Lower pole section: length 150 cm, diameter 45 mm, in the selected coating.
N° 1 Lower Plate with QuickSpin™ (the movement of the plate is normal, it allows compensation for an inclination of up to 9°).
N° 1 Grid tip.
N° 1 Tepee bar, length 1 m.
N° 4 Bar fixing screws.
N° 4 Steel anchoring cables, length 5 m.
N° 4 Ratchet tensioning straps, length 5 m.
N° 4 Steel safety karabiners.
N° 2 Shackles.
N° 1 Instruction sheet with QR code.
N° 1 Bag containing the following hardware:
- 1 x 4 mm Allen key
- 1 x 5 mm Allen key
- 1 x 6 mm Allen key
- 1 x 8 mm open-end wrench
- 1 x steel cone-point grub screw for the optional QuickSpin™ lock/unlock function

2.1 TOOLS REQUIRED FOR INSTALLATION (NOT INCLUDED)
N° 4 Anchoring points
N° 1 Pliers
N° 1 Spirit level
N° 1 Tension meter
N° 1 Protractor
Fixing hardware for permanent installation, required to secure the pole to the floor. This must be selected and purchased according to the type of flooring:
- masonry or tiled floors: 3 x 6 mm nylon rawlplugs
- wooden stages: 4x35 mm self-tapping screws
- outdoor installations: 6 mm diameter ground stakes
- non-drillable floors (e.g. dance floors): Arena Floor Plate.
If in doubt, consult qualified personnel.
Take care when unpacking the pole sections and components to avoid damaging the pole coating. All pole assembly operations must be carried out from the ground.
3.0 REQUIREMENTS AND SPECIFICATIONS
3.1 The Tepee Pole requires four anchoring points, each capable of withstanding at least 250 kgf in the direction of pull.
3.2 Each steel cable, connected to the ratchet tensioning strap by means of a karabiner, can reach a maximum total length of 7.4 m.
3.3 The Lower Plate of the Tepee Pole must be secured to the floor using three screws (not included). These must be selected and purchased according to the type of flooring.
3.4 If it is not possible to screw the Lower Plate to the floor (section 7.3), the Tepee Pole is compatible with installation on the Arena Floor Plate.
4.0 TEPEE HEAD ASSEMBLY
The following components are required for this operation:
N° 1 Grid tip.
N° 1 Tepee bar, length 1 m.
N° 4 Bar fixing screws.
N° 4 Steel anchoring cables, length 5 m.
N° 4 Ratchet tensioning straps, length 5 m.
N° 4 Steel safety karabiners.
N° 2 Shackles.
N° 1 x 6 mm Allen key.
N° 1 Pliers (not included).
4.1 TEPEE HEAD ASSEMBLY

2° Take the 1 m Tepee bar and position it on the Grid tip in one of the designated slots (any slot may be used, they are all identical).
3° Using the 6 mm Allen key, tighten the 4 screws clockwise until fully seated, applying light tightening torque. Make sure that the bar is correctly aligned and firmly secured.
Do not install the Tepee bar if it shows any bending at rest or deformation. In this case, contact Technical Support.

4.2 ANCHORING CABLE ASSEMBLY
1° Take the 2 shackles and the 4 steel cables. Manually remove the shackle pins by turning them counterclockwise.
2° Insert 2 cables into each shackle, leaving the opposite end of each cable free.

3° Take the Tepee bar and position the shackles in the outermost holes. Manually screw the shackle pins clockwise until fully tightened, keeping the shackles angled downward, as shown in the image.

4° Using pliers (not included), firmly tighten the shackle pins clockwise while keeping the shackles angled downward, making sure they are securely closed. Check that the shackle can rotate around the pin.
5° Take the 4 karabiners. Unscrew the safety sleeve to open them and attach each karabiner to one of the four free ends of the cables.
Do not re-tighten the safety sleeves yet.

6° Take the 4 ratchet tensioning straps, form them into loops and attach them to the 4 karabiners.
7° Re-tighten the safety sleeves on all 4 karabiners.

5.0 TEPEE POLE ASSEMBLY
The following components are required for this operation:
N° 2 Upper pole sections: length 150 cm, diameter 45 mm, in the selected coating, with pre-assembled internal joints.
N° 1 Lower pole section: length 150 cm, diameter 45 mm, in the selected coating.
N° 1 Lower Plate with QuickSpin™ (the movement of the plate is normal and allows compensation for an inclination of up to 9°).
N° 1 x 5 mm Allen key
5.1 JOINING THE POLE SECTIONS
1° Place the three pole sections on the ground. The two upper sections can be identified by the presence of the pre-assembled internal joints.
2° Join the first 2 sections together, as shown in the images. Do not force the connection. If the joint does not slide in smoothly, contact the Technical Support Department.

3° Rotate the pole section until the holes align with the locking pin. Using the 5 mm Allen key, tighten the joint screw by turning it clockwise until fully seated, making sure that the locking pin correctly engages in the hole and that the screw is firmly tightened. If the pole is never disassembled, the locking pin must still be checked and tightened periodically.

4° Repeat the same procedure with the third pole section.

Video how to join and tighten the two pole sections
5.2 INSTALLING THE LOWER PLATE INTO THE LOWER POLE SECTION
The lower pole section can be identified by the pre-installed brass bushing at its base, fitted with a safety ring.
PERFORM THIS OPERATION WITH THE POLE LYING HORIZONTALLY ON THE GROUND.
1° Lower the QuickSpin™ selector (static pole position).
2° Screw the Lower Plate clockwise into the lower pole section, stopping approximately 2 cm before reaching the safety ring. If the base cannot be fully screwed in and becomes stuck, slightly loosen the two safety screws, WITHOUT REMOVING THEM, then continue tightening.


5.3 INSERTING THE TEPEE HEAD INTO THE POLE
Keeping the pole on the ground, insert the Tepee Head into the upper end of the assembled pole, applying steady pressure until it is fully inserted.

6.0 CABLE ANCHORING
The entire operation must be carried out by competent and qualified personnel.
6.1 The total length of cable + karabiner + rachet tensioning strap ranges between 5.3 m and 7.4 m. If the cables need to be anchored at distances greater than those reachable with the supplied cables, use ropes or straps with a minimum load capacity of 250 kgf.
6.2 All 4 cables must be secured to 4 separate anchoring points.
6.3 Each anchoring point must be strong enough to withstand a force of approximately 250 kgf in the direction of pull. This force may vary depending on the performer's weight and the movements performed during the performance.
6.4 The tension applied to each individual cable should be approximately between 50 and 80 kg. This value can be checked using a tension meter (not included).
6.5 The rachet straps must be connected to each anchoring point using suitable connection systems that do not damage the strap fibres (e.g. karabiner, quick link, shackle, suitable anchoring device, etc.).
6.6 On the vertical plane (side view), the cables should preferably form angles between 5° and 55° relative to the ground. On the horizontal plane (top view), the cables should preferably form angles between 35° and 55° relative to the direction of the 1 m Tepee bar (see diagrams below). Check the inclination using a protractor (not included).
6.7 If possible, position or select the anchoring points so that they are evenly spaced around the pole installation point.
For anchoring point placement, refer to the diagrams below. The indicated minimum and maximum distances represent the optimal configurations achievable using the supplied cables and a pole with a standard height of 4.50 m (maximum configurable height).
If a shorter pole is used, contact Technical Support to obtain the correct measurements according to the specific pole height.






7.0 SYSTEM INSTALLATION
Installation of the Tepee Pole requires AT LEAST two people.
Before starting, make sure that the anchoring points have already been prepared.
The entire operation must be carried out by competent and qualified personnel.
7.1 TEPEE POLE INSTALLATION
1° Adjust the ratchet tensioning straps to their maximum length, always leaving at least 20 cm of extra webbing.
2° Position the pole on the ground, approximately aligning the centre of the pole with the intended installation point.
3° Connect the ratchet straps to the anchoring points, ensuring that the steel cables are not overlapping or twisted.
4° With the assistance of a second person, lift the pole from the ground and bring it into a vertical position.
WARNING! DO NOT LIFT THE POLE BY LEVERING ON THE LOWER PLATE, AS THIS MAY DAMAGE IT!

5° While keeping the pole in a vertical position, place the base of the pole at the selected installation point.
6° Once the pole has been stabilised, one of the two operators may release it and move to one of the anchoring points.
7° While keeping the pole in a vertical position, check its vertical alignment using a spirit level (not included) and, using the ratchets, progressively adjust the length of the straps until the pole is stabilised in position. During this operation, make sure that the 1 m Tepee bar maintains the correct orientation relative to the anchoring points (see diagrams in section 6.0).
8° Gradually adjust the tension of the straps until an indicative preload of 50 - 80 kg is applied to each one. At this tension, it is normal for the Tepee bar and the cables to show slight bending. Do not exceed the specified tension loads.
WARNING! Do not increase the tension of the straps in an attempt to make the structure more rigid: excessive tension does not increase the rigidity of the structure, but may subject the components to dangerous overloads. Adjust the cables only until the specified tension is reached. If the pole bends after tensioning, check that the cables are tensioned symmetrically and evenly.
7.2 CHECK THAT THE POLE IS LEVEL

7.3 FIXING THE POLE TO THE FLOOR WITH SCREWS
The entire operation must be carried out by competent and qualified personnel.
7.3.1 MASONRY OR TILED FLOORS
1° Once the pole has been correctly levelled, use the holes in the Lower Plate as a reference and mark the three drilling points on the floor.
2° Move the Lower Plate a few centimetres to clear the working area.
3° Drill the three holes at the previously marked points.
WARNING! Do not drill through the holes in the Lower Plate, as this may damage it. Always move the pole before drilling.
4° Insert the rawlplugs into the holes.
5° Reposition the pole so that the holes in the Lower Plate align with the holes prepared in the floor.
6° Insert and tighten the screws until the Lower Plate is firmly secured.

7.3.2 WOODEN STAGES
Use 4x35 mm self-tapping screws.
Once the pole has been correctly levelled, secure the Lower Plate to the floor by inserting the screws through the three designated holes.

7.3.3 OUTDOOR INSTALLATIONS
Use 6 mm diameter ground stakes.
Once the pole has been correctly levelled, insert the stakes through the three holes in the Lower Plate and secure it firmly to the ground.

7.3.4 NON-DRILLABLE FLOOR (ARENA FLOOR PLATE)
If the floor cannot be drilled (e.g. dance floors), the Tepee Pole can be installed using the Arena Floor Plate.


2° Gradually loosen the rachet tensioning straps and move the pole to clear the working area.
3° Install the Arena Floor Plate following the relevant instructions, making sure that, once positioned, the threaded holes align with the three points previously marked on the floor.
4° Reposition the pole and check that the holes in the Lower Plate align with the threaded holes in the Arena Floor Plate.
5° Secure the Lower Plate to the Arena Floor Plate using the supplied screws.

7.4 STABILITY CHECK
Before use, check that the floor fixing and cable tensioning have been carried out correctly by performing a stability check of the pole.
1° Stand in front of the pole, grip it firmly with both hands and shake it to make sure that it does not move from its position.
2° Repeat the same check while standing to the side of the pole.
If the installation has been carried out correctly, the pole must remain stable and must not move.
If the pole moves during the check, do not use it and check the installation steps again, paying particular attention to the floor fixing and correct cable tensioning.
If in doubt, contact the Technical Department.
7.5 SPIN SMOOTHNESS CHECK
1° Raise the QuickSpin™ selector (spin position).
2° Test the smoothness of the spin by spunning the pole on its axis.
The rotation of the pole secured to the floor is considered correct when, after being set in motion with a firm push, the pole completes at least 1 - 2 full rotations.
If the spin is smooth:
Proceed to the next step: TIGHTENING THE SAFETY SCREWS.
If the spin is not smooth:
Using a tension meter (not included), check that excessive tension has not been applied to the straps. If a tension meter is not available, progressively and evenly reduce the cable tension until adequate rotation is achieved.
If the spin is uneven:
Check that the rachet straps are tensioned evenly and verify the vertical alignment of the pole again.
7.6 TIGHTENING THE SAFETY SCREWS: THIS PROCEDURE IS ESSENTIAL TO SECURE THE POLE AND PREVENT IT FROM UNSCREWING DURING STATIC USE. IT MUST ALWAYS BE PERFORMED.
1° Take the 8 mm open-end wrench.
2° Position the 8 mm open-end wrench correctly and alternately tighten the hexagonal safety screws by turning them counterclockwise (when facing the floor). Apply adequate tightening torque without using excessive force, in order to prevent premature damage to the screws.

7.6.1 HOW TO TIGHTEN THE TWO SAFETY SCREWS
1° Make sure that the 8 mm open-end wrench is correctly positioned so that the screws are fully tightened and the pole cannot unscrew in static mode.
2° As shown in the images, the 8 mm wrench must not touch the threaded shaft of the pole.
If the pole unscrews in static mode, this means that the two safety screws have not been tightened correctly.
CORRECT POSITION OF THE 8 MM WRENCH

INCORRECT POSITION OF THE 8 MM WRENCH

7.6.2 TIGHTNESS CHECK
1° Lower the QuickSpin™ selector to the static position.
2° Check that the pole does not rotate by attempting to turn it counterclockwise.
WARNING!! If the pole rotates in static mode, the screws have not been tightened correctly. Tighten the screws until they no longer turn, but do not force them, otherwise you may not be able to loosen them when the pole needs to be disassembled.

8.0 QUICKSPIN™ SYSTEM OPERATION
- QuickSpin™ selector lowered: static pole.
- QuickSpin™ selector raised: spin pole.
8.1 DISABLING THE QUICKSPIN™ SYSTEM (OPTIONAL FUNCTION)
If you wish to lock the QuickSpin™ in either spin or static position, use the optional cone-point screw and the 4 mm Allen key.
If you do not wish to lock the QuickSpin™, DO NOT insert the screw.
Locking QuickSpin™ in Spin Mode:
1° Raise the QuickSpin™ selector.
2° Insert the cone-point screw into the free hole.
3° Tighten the screw fully using the 4 mm Allen key.
4° Unscrew the screw to release the QuickSpin™.
Locking QuickSpin™ in Static Mode:
1° Lower the QuickSpin™ selector.
2° Insert the cone-point screw into the free hole.
3° Tighten the screw fully using the 4 mm Allen key.
4° Unscrew the screw to release the QuickSpin™.

8.2 DO NOT TOUCH THE SLOTTED SCREW
This screw regulates the QuickSpin™ mechanism and is factory-calibrated during production. If this screw is tampered with, the QuickSpin™ may no longer remain in the spin mode and you will need to contact Technical Support.

9.0 POLE DISASSEMBLY
The entire operation must be carried out by competent and qualified personnel.
9.1 LOOSEN THE SAFETY SCREWS WITHOUT EVER REMOVING THEM COMPLETELY
1° Correctly position the 8 mm open-end wrench on the safety screws to prevent premature damage.
2° Loosen the safety screws by turning the 8 mm open-end wrench clockwise (when facing the floor), without ever removing them completely.

9.2 REMOVE THE FLOOR FIXING SCREWS
Hold the pole very carefully to prevent it from falling.
Unscrew and remove the 3 screws from the Lower Plate. For outdoor installations, pull out the 3 ground stakes.
9.3 DISCONNECT THE ANCHORS AND REMOVE THE POLE
1° While one operator keeps the pole stable, the other can move to one of the anchoring points.
2° Gradually loosen the rachet tensioning strap using the ratchet mechanism, reducing the tension without releasing it abruptly.
3° Repeat the operation on all remaining straps.
4° Disconnect the straps from the anchoring points, removing the connecting devices (karabiners, quick links, shackles, etc.), taking care not to damage the strap fibres.
5° Once all anchoring points have been disconnected, the pole can be removed and placed on the ground or stored in the dedicated Pole Rack (it is recommended to remove the Tepee Head first, section 10.1). If stored vertically, the pole must be properly secured to prevent accidental falling.
10.0 DIVIDING THE POLE (optional)
Lay the pole horizontally on the ground before proceeding.
10.1 REMOVE THE TEPEE HEAD
Pull firmly to slide the Tepee Head out of the upper pole section.

10.2 DIVIDING THE THREE POLE SECTIONS
1° Using the 5 mm Allen key, loosen the screw in the upper section by 3 turns.
2° Rotate the pole until the two silver pins become visible, then use the Allen key to push inward the pin that was just loosened.
3° Gently separate the sections by pulling them apart.
4° Repeat the procedure with the remaining two pole sections.
WARNING: DO NOT LOOSEN THE ALLEN SCREW BY MORE THAN 3 TURNS COUNTERCLOCKWISE, OTHERWISE THE STEEL SCREW WILL PROTRUDE FROM THE OPPOSITE SIDE AND BLOCK THE JOINT. IF THIS HAPPENS, FULLY TIGHTEN THE STEEL SCREW CLOCKWISE USING THE 5 MM ALLEN KEY, THEN LOOSEN IT COUNTERCLOCKWISE BY ONLY 3 TURNS.
11.0 PRE-USE INSPECTIONS
11.1 BEFORE EACH USE, check that the pole joints are properly tightened.
11.2 Verify that all structural components are correctly assembled.
11.3 Ensure that the shackles are tightened so that they cannot be unscrewed manually.
11.4 At each installation, ensure that the floor and the rubber pad underneath the Lower Plate are perfectly clean.
11.5 Apply the load gradually in order to verify the stability of the structure and the correctness of the assembly.
11.6 In the presence of children, exercise maximum caution during installation and relocation.
11.7 If any anomalies are detected, contact Customer Support at
12.0 MAINTENANCE
12.1 Pole cleaning
GeckoGrip Pole: use isopropyl alcohol on a microfiber cloth.
Inox Pole: use water with 5% ammonia on a microfiber cloth.
UltraGrip Pole: use MEK (Methyl Ethyl Ketone) on a lint-free cotton cloth.
SuperGrip Pole (previously known as UltraGrip3): use 90° alcohol on a soft cloth.
During cleaning, use appropriate personal protective equipment. It is recommended to ventilate the room after cleaning the pole.
12.2 Before each use, check the integrity and any signs of wear on the rachet tensioning straps and anchoring cables.
12.3 After use, store all components in their original packaging or in the dedicated transport bags in order to preserve their integrity and facilitate handling.
13.0 WARNINGS AND PRECAUTIONS
13.1 The tools required for assembly, installation and disassembly are supplied. Before using different tools on the pole, contact Technical Support to verify the suitability of the intended operation.
13.2 Any extension of the stabilising cables must only be carried out using suitable equipment.
13.3 During all phases of assembly, installation and disassembly, always exercise maximum caution and follow the instructions.
13.4 If in doubt, contact Technical Support.
13.5 Do not allow the product to be used, installed or handled by unqualified persons or minors unless supervised.
13.6 As sports equipment, the product must be used by trained and competent individuals.
13.7 Do not attempt moves beyond your capability without supervision.
13.8 Use appropriate protective equipment and certified crash mats.
13.9 When not in use, ensure that the product is stored in a safe position.
AGMDESIGN.IT SHALL NOT BE LIABLE FOR ANY DAMAGE TO PROPERTY OR PERSONAL INJURY CAUSED BY IMPROPER USE OF THE PRODUCT.
14.0 TROUBLESHOOTING
14.1 THE POLE SPINS SLOWLY
Excessive tension may have been applied to the ratchet tensioning straps during installation: reduce the tension, see section 7.1.
14.2 THE POLE MAKES NOISE WHEN SPINNING
Verify that the pole is perfectly level (section 7.2).
14.3 THE QUICKSPIN™ SELECTOR DROPS AND DOES NOT REMAIN IN THE SPIN OR STATIC POSITION
If the QuickSpin™ selector does not remain in the selected position and tends to drop, the black slotted screw may have lost its calibration.
The screw is visible through the hole on the outer diameter of the QuickSpin™ selector (see section 8.2).
The screw is factory-calibrated and held in position using medium-strength threadlocker. Following tampering or, over time, due to vibration, the threadlocker may lose its effectiveness and allow the screw to move from its factory-set position.
To prevent the screw from moving again, it must first be secured in position and the selector must then be recalibrated.
SECURING THE SCREW:
1° Using a suitably sized flat-head screwdriver, completely unscrew the screw and remove it from the hole.
2° Wrap the screw with 3 - 4 turns of PTFE (Teflon) tape, commonly used in plumbing to seal threaded connections.
3° Reinsert the screw into the hole and tighten it completely until it bottoms out.
CALIBRATING THE QUICKSPIN™ SELECTOR:
1° After tightening the screw completely until it bottoms out, loosen it by half a turn.
2° Check the movement of the QuickSpin™ selector.
3° If the movement is still too stiff, loosen the screw by an additional 1/4 turn at a time until the selector moves correctly.
The calibration has been correctly restored when the selector can be moved easily between the SPIN and STATIC positions and remains securely in the selected position.
14.4 THE QUICKSPIN™ IS BLOCKED
Ensure that the optional locking screw has not been inserted and that the slotted screw has NOT been tampered with (section 8.2).
If the optional locking screw is not inserted, the QuickSpin™ may be blocked because the slotted screw has lost its correct calibration. In this case, restore the calibration as described in section 14.3.
Verify that the pole is level (section 7.2).
14.5 THE RUBBER PAD AT THE BASE OF THE POLE HAS DETACHED
The pads are installed without the use of chemical adhesives. If a pad becomes detached, clean the contact surfaces and reattach it using standard double-sided adhesive tape (replacement pads are supplied with adhesive backing).
14.6 THE POLE UNSCREWS IN STATIC MODE
Check that the safety screws have been correctly tightened (section 7.6).
14.7 GECKOGRIP AND INOX POLES FEEL MORE SLIPPERY THAN IN OTHER INSTALLATIONS
Clean the poles as described in section 12.1.
If the issue persists, check other possible factors such as excessive environmental humidity, perspiration, etc.
If a conformity defect is suspected, contact Customer Service within the terms specified in the Conditions of Sale.